Quick Reference
Menu map, key models, codes and statuses
Menu Map
| Group | Models |
|---|---|
| Site Register | Organisation, Mine Site, Operating Area, Person, Position, Person Position, Equipment |
| Publications & Requirements | Publication Authority, Publication, Publication Section, Requirement, Site Obligation |
| Risk & Controls | Principal Hazard, Hazard Scenario, Material Unwanted Event, Critical Control, Control Performance Standard, Control Applicability, PHM Plan, Plan Section, Plan Requirement Link |
| Verification | Verification Template, Verification Question, Verification Schedule, Verification Event, Verification Response, Control Deficiency, Restoration Verification |
| Events & Investigations | Adverse Event, Event Hazard Link, Event Control Link, Person Involvement, Injury Record, Loss Record, Investigation, Investigation Timeline Event, Investigation Finding, Evidence |
| Actions & Work | Corrective Action, Work Order, Work Order Task, Audit, Audit Finding, Management of Change, Change Impact |
| Monitoring | KPI, KPI Result, Notification |
Key Codes in the Demo Data
| Code | What it is |
|---|---|
PH-VEHICLE |
Principal hazard: Roads and Vehicle Operating Areas |
MUE-001..003 |
Material unwanted events (collision, rollover, pedestrian strike) |
CC-001..005 |
Critical controls (positive comms, separation, brakes, speed, proximity detection) |
CD-2026-001 |
Control deficiency: proximity detection failed at 22 m vs 50 m standard |
AE-2026-014 |
High-potential near miss at Intersection 5 |
INV-2026-005 |
ICAM investigation into AE-2026-014 |
CA-2026-021..023 |
Corrective actions (repair, training, procedure change) |
WO-2026-108 |
Work order: replace PDS antenna on HT-201 |
PHMP-VEH-001 |
Principal hazard management plan (vehicle interaction) |
Status Vocabularies (the important ones)
Control status (on verification events, deficiencies, event links):
EFFECTIVE · EFFECTIVE_WITH_OBSERVATION · DEGRADED · FAILED · NOT_AVAILABLE ·
NOT_APPLICABLE · NOT_VERIFIED · OVERDUE
Verification result: PASS · PASS_WITH_OBSERVATION · DEGRADED · FAIL ·
NOT_APPLICABLE · INCOMPLETE
Severity (actual and potential recorded independently):
LEVEL_1 (minor) … LEVEL_5 (catastrophic). LEVEL_4/5 deficiencies escalate
immediately; high-potential events require investigation.
Corrective action: OPEN → ASSIGNED → IN_PROGRESS → COMPLETE → VERIFIED →
CLOSED (cannot close while verification is required but not done).
Work order: REQUESTED → APPROVED → PLANNED → RELEASED → IN_PROGRESS →
COMPLETE → VERIFIED → CLOSED — completion never restores a control by
itself; see Restoration Verification.
Rules of Thumb
- A CRITICAL control always has: one MUE, an owner position, an active performance standard, and a verification frequency.
- A FAIL verification ⇒ a Control Deficiency (with operational restriction and temporary control where applicable).
- Restoration Verification (independent) gates both control restoration and operation release.
- Failed controls stay visible (dashboards, notifications) until restoration is verified.